{"action":"create","ckan_id":null,"date_created":"Fri, 27 Mar 2026 21:35:27 GMT","date_finished":null,"harvest_job_id":"76d4e21a-39a9-4703-a284-1131ccfd192b","harvest_source_id":"3dddf3ae-84a3-4731-88b4-6a0b57d0e503","id":"eaf3869f-454e-46a0-bbcf-63c60bec6082","identifier":"https://datainventory.usbr.gov/rise/item/128610","parent_identifier":null,"source_hash":"ff5f536e89263c34bf47f7b77edb6f9688269b003c4ab2a42e12a73ce6a4afa2","source_raw":"{\"accessLevel\": \"public\", \"accrualPeriodicity\": \"irregular\", \"bureauCode\": [\"010:10\"], \"contactPoint\": {\"@type\": \"vcard:Contact\", \"fn\": \"RISE Team\", \"hasEmail\": \"mailto:data@usbr.gov\"}, \"description\": \"This technical report documents final results from six years of an interagency, adaptive sediment management program for the removal of Elwha and Glines Canyon dams including: (1) physical changes to the reservoirs and downstream river channel resulting from dam removal, (2) effects of dam removal on downstream water quality (sediment loads) and flood stage, (3) dam removal and reservoir drawdown methods (Appendix A), (4) modeling accomplished to support the EIS and adaptive management program (Appendix B), (5) dam operational effects on downstream discharge prior to dam removal (Appendix C), and (6) a literature review on potential effects of dam removal on the City of Port Angeles Ranney Well (Appendix D).\", \"distribution\": [{\"@type\": \"dcat:Distribution\", \"accessURL\": \"https://data.usbr.gov/catalog/8010/item/128610\", \"description\": \"Landing page for \\\"Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project\\\"\", \"mediaType\": \"text/html\", \"title\": \"RISE Item Details Page URL for \\\"Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project\\\"\"}, {\"@type\": \"dcat:Distribution\", \"description\": \"\\\"Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project\\\" as a PDF file\", \"downloadURL\": \"https://data.usbr.gov/rise/content-rise-public/rise/catalog-item/binary/SRH-2018-13_Adaptive Sediment Management Program_Elwha_Final_508.pdf\", \"mediaType\": \"application/pdf\", \"title\": \"PDF File for \\\"Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project\\\"\"}], \"identifier\": \"https://datainventory.usbr.gov/rise/item/128610\", \"keyword\": [\"Adaptive Management\", \"Dam Removal\", \"Monitoring\", \"Reservoir Sedimentation\"], \"landingPage\": \"https://data.usbr.gov/catalog/8010/item/128610\", \"modified\": \"2025-11-19T21:08:04Z\", \"publisher\": {\"@type\": \"org:Organization\", \"name\": \"Bureau of Reclamation\"}, \"spatial\": \"{\\\"type\\\":\\\"LineString\\\",\\\"coordinates\\\":[[-123.56501,48.1436],[-123.55654,48.13077],[-123.55265,48.11289],[-123.55952,48.0947],[-123.57348,48.0788],[-123.59351,48.03673],[-123.59023,48.01136],[-123.60358,47.99769],[-123.60518,47.98697],[-123.5713,47.9528],[-123.55236,47.94973],[-123.54183,47.9422],[-123.49297,47.90798],[-123.47546,47.88427],[-123.44971,47.79732],[-123.4687,47.75087],[-123.52158,47.7384],[-123.55316,47.74625],[-123.58381,47.77336]]}\", \"title\": \"Adaptive Sediment Management Program Final Report for the Elwha River Restoration Project\"}","source_transform":null,"status":"error"}
